direct_design

Our Services

Desk study – which includes a site walkover, full ecological records search, full ‘Envirocheck’ Search, full Coal Authority records search, Consultation with EHO / Building Regulations Dept. / Archaeology Department, Flood Plain details, Constraints analysis

Item

Cost

Desk Study
£595/day
Site Visit
£495/day

 

Ground investigation – in-situ permeability testing to derive design data – e.g trial pits, auger holes, window sampling etc.

High Intensity Scenario

Item

Cost

Engineer
£495/day
Tanker
£550/day
JCB
£390/day

Low Intensity Scenario

Item

Cost

Engineer
£495/day
Window Sampler
£880/day

Note: These figures are indicative and as no ground conditions are the same, may be subject to variation on a job by job basis

Soakaway design – using BRESOAK software and our knowledge of impermeable runoff areas, we can design appropriate soakaway sizes and types.

Item

Cost

Preliminary Design
£80
Full Design
£700/day

Note: These figures are indicative and as no ground conditions are the same, may be subject to variation on a job by job basis

Design of swales and basins – we can provide access to expert consultants for all of your design needs.

Item

Cost

Full Design
£700/day

Note: These figures are indicative and as no ground conditions are the same, may be subject to variation on a job by job basis
 

If you want to know more, or order our services call us on: 01273 699406 or email us on sustainable.drainage@gesl.net